Ready built factory 3A

Ready built factory 3A
LONG HAU INDUSTRIAL PARK
READY-BUILT FACTORY LOT 3A – LONG HAU PHASE 3

PRODUCT PROFILE
 
I.    STRATEGIC LOCATION
The project is located strategically right in the heart of Southern Economic Region
 
II.    MASTER PLAN
RBF 3A project is divided into 5 phases. The 1st phase - RBF 3A 26-25-24-23 is under progression
 
 

III.    LAYOUT AND KEY SPECIFICATIONS
Each RBF is structured with 2.716 sqm of workshop and 300 sqm of office space
 
zoom

IV.    QUOTATION
1.   Leasing price
No.
Factory
Scale
(sqm)
Workshop/office
(sqm)
Price
(USD/sqm/month
Note
1
3A-26-25-24-23
12.067
Workshop: 10.866
Office: 1.204
Workshop: 5.8 USD
Office: 6.8 USD

Management feeincluded

2
3A-26
3.016,8
Workshop: 2.716
Office: 300,8 (2 tầng)
3
3A-25
3.016,8
Workshop: 2.716
Office: 300,8 (2 tầng)
4
3A-24
3.016,8
Workshop: 2.716
Office: 300,8 (2 tầng)
5
3A-23
3.016,8
Workshop: 2.716
Office: 300,8 (2 tầng)
* VAT% exclusive
 
2.    Method of payment & deposit
Category
Time of payment
Value
DepositAfter signing the deposit agreementEquivalent to 6-month leasing price
Payment25th day of every month 
Minimum contract term: 6 years (The rent will be fixed in the first three years of the Workshop Lease Contract, and will be increased 10% for the following 03 year period in accordance with the unit price of the Workshop Lease Contract)
 
3.    Handover
Booking: NOW
Handover: QII/2022

V.    APPENDIX
1.    Suitable investors
  • Preferable industries: Hi-tech and supporting for hi-tech industries; Pharmaceuticals, Medical devices and Healthcare products manufacturing; Hi-tech and supporting for hi-tech industries; Mechanics, Engineering and Electronic; Environmental-friendly and clean industries; Chemicals, New Materials, R&D; etc.
  • Companies in HCMC area looking for standard workshops for business expansion in Long An province after COVID-19
  • Existing investors in Tan Thuan Export Processing Zone, HCMC Hi-tech Park, Hiep Phuoc Industrial Park and other IPs in HCMC area
  • Foreign investors from USA, EU, UK, Japan, South Korea, Taiwan, South East Asia, India, Australia, etc. are coming to Vietnam in production shift wave post-pandemic
  • Foreign investors having plan to enter Vietnam’s potential consumers market
2.    Detailed specifications
GENERAL INFORMATION
Location

Lot 3A, Long Hau IP 3
In the front of Road No.10: 24m width

ScaleLand area: 17.000 sqm
Workshop area: 10.866 sqm
Office area: 1.204 sqm

Power source

Low voltage electricity customized for RBF 3A
Each workshop has its own safety electricity box
Clean water source10,000 – 12,000 cubic meter/day
Fire protectionSprinkler and alarming system including smoke and temperature detecting devices
Lighting systemHigh-pressure mercury light 125W -220V
WORKSHOP
PRODUCTION AREA
Floor

Floor capacity 2.000 kg/sqm
Epoxy finishing

CeilingBluescope Kiplok tole 0.47mm thickness
Under-ceiling insulation sheet
Automatic rolling door5x6m, auto locking
WindowSteel frame with glass
HeightTop height 10.36m and ceiling height 6m
OFFICE (2 floors)
FloorCement finishing with tiles
Ceiling

Waterproof aluminum curved frame, gypsum ceiling, 3m height

WallPainted brick wall
Door and windowAluminum window frame with glass, hinged main door
Height4m
Monitor and security roomInside office, area 32,4 sqm, aluminum window frame with glass
LightingMercury light, downlight, emergency light, exit light

 

Contact to:

LONG HAU CORPORATION
Address: Hamlet 3, Long Hau Ward, Can Giuoc District, Long An Province
Hotline: 0906 938 599 - (028) 3937 5599
Email: sales@longhau.com.vn

    
PROJECT PERSPECTIVE
 
 
IMAGES OF RBF LOT T4 FOR REFERENCE
 
 
 
 
 
 
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A
Ready built factory 3A

View more

Long Hau Residential Area
Purified Drinking Water