Ready built factory 3A
Ready built factory 3A
LONG HAU INDUSTRIAL PARK
READY-BUILT FACTORY LOT 3A – LONG HAU PHASE 3
PRODUCT PROFILE
READY-BUILT FACTORY LOT 3A – LONG HAU PHASE 3
PRODUCT PROFILE
I. STRATEGIC LOCATION
The project is located strategically right in the heart of Southern Economic Region

The project is located strategically right in the heart of Southern Economic Region

II. MASTER PLAN
RBF 3A project is divided into 5 phases. The 1st phase - RBF 3A 26-25-24-23 is under progression
RBF 3A project is divided into 5 phases. The 1st phase - RBF 3A 26-25-24-23 is under progression


III. LAYOUT AND KEY SPECIFICATIONS
Each RBF is structured with 2.716 sqm of workshop and 300 sqm of office space


IV. QUOTATION
1. Leasing price
No. | Factory | Scale (sqm) | Workshop/office (sqm) | Price (USD/sqm/month | Note |
1 | 3A-26-25-24-23 | 12.067 | Workshop: 10.866 Office: 1.204 | Workshop: 5.8 USD Office: 6.8 USD | Management feeincluded |
2 | 3A-26 | 3.016,8 | Workshop: 2.716 Office: 300,8 (2 tầng) | ||
3 | 3A-25 | 3.016,8 | Workshop: 2.716 Office: 300,8 (2 tầng) | ||
4 | 3A-24 | 3.016,8 | Workshop: 2.716 Office: 300,8 (2 tầng) | ||
5 | 3A-23 | 3.016,8 | Workshop: 2.716 Office: 300,8 (2 tầng) |
2. Method of payment & deposit
Category | Time of payment | Value |
Deposit | After signing the deposit agreement | Equivalent to 6-month leasing price |
Payment | 25th day of every month | |
Minimum contract term: 6 years (The rent will be fixed in the first three years of the Workshop Lease Contract, and will be increased 10% for the following 03 year period in accordance with the unit price of the Workshop Lease Contract) |
3. Handover
Booking: NOW
Handover: QII/2022
Booking: NOW
Handover: QII/2022
V. APPENDIX
1. Suitable investors
- Preferable industries: Hi-tech and supporting for hi-tech industries; Pharmaceuticals, Medical devices and Healthcare products manufacturing; Hi-tech and supporting for hi-tech industries; Mechanics, Engineering and Electronic; Environmental-friendly and clean industries; Chemicals, New Materials, R&D; etc.
- Companies in HCMC area looking for standard workshops for business expansion in Long An province after COVID-19
- Existing investors in Tan Thuan Export Processing Zone, HCMC Hi-tech Park, Hiep Phuoc Industrial Park and other IPs in HCMC area
- Foreign investors from USA, EU, UK, Japan, South Korea, Taiwan, South East Asia, India, Australia, etc. are coming to Vietnam in production shift wave post-pandemic
- Foreign investors having plan to enter Vietnam’s potential consumers market
2. Detailed specifications
GENERAL INFORMATION | |
Location | Lot 3A, Long Hau IP 3 |
Scale | Land area: 17.000 sqm |
Workshop area: 10.866 sqm | |
Office area: 1.204 sqm | |
Power source | Low voltage electricity customized for RBF 3A |
Each workshop has its own safety electricity box | |
Clean water source | 10,000 – 12,000 cubic meter/day |
Fire protection | Sprinkler and alarming system including smoke and temperature detecting devices |
Lighting system | High-pressure mercury light 125W -220V |
WORKSHOP | |
PRODUCTION AREA | |
Floor | Floor capacity 2.000 kg/sqm |
Ceiling | Bluescope Kiplok tole 0.47mm thickness |
Under-ceiling insulation sheet | |
Automatic rolling door | 5x6m, auto locking |
Window | Steel frame with glass |
Height | Top height 10.36m and ceiling height 6m |
OFFICE (2 floors) | |
Floor | Cement finishing with tiles |
Ceiling | Waterproof aluminum curved frame, gypsum ceiling, 3m height |
Wall | Painted brick wall |
Door and window | Aluminum window frame with glass, hinged main door |
Height | 4m |
Monitor and security room | Inside office, area 32,4 sqm, aluminum window frame with glass |
Lighting | Mercury light, downlight, emergency light, exit light |
Contact to:
LONG HAU CORPORATION
Address: Hamlet 3, Long Hau Ward, Can Giuoc District, Long An Province
Hotline: 0906 938 599 - (028) 3937 5599
Email: sales@longhau.com.vn
PROJECT PERSPECTIVE


IMAGES OF RBF LOT T4 FOR REFERENCE















