Free website hits

READY-BUILT HIGH-RISE FACTORY

READY-BUILT HIGH-RISE FACTORY
Long Hau Leed Park

LONG HAU LEED PARK
ESG-Standard Production and Logistics Center

The Long Hau LEED Park project at Long Hau Industrial Park (Tay Ninh) is designed according to "Ready-to-operate" criteria. Businesses can start operations immediately thanks to the dual-purpose factory model and 1:1 support services. Long Hau LEED Park simultaneously solves the problem of factory setup speed and the strict ESG requirements of international partners.

PROJECT SPECIFICATIONS:

Total floor area: ~56,000 m² | Area: 1,000 - 2,000 m² - 6,000 m² | Clear height: from 5,86 m to 8,26 m | Logistics corridor: 5 m | Freight elevator: 4 tons | Total power capacity: 4,000 kVA - Per unit: 174 | 294 | 321 kVA

Status: Now accepting Bookings, expected handover Nov/2026

Target Sectors: Precision technology, electronic components & semiconductors, pharmaceuticals & high-tech medical devices, R&D centers, quality services, smart logistics, and e-commerce.

MASTER PLAN

Long Hau Leed Park Master Plan

TECHNICAL SPECIFICATIONS DESCRIPTION

Long Hau Leed Park Realistic Perspective

PROJECT INTRODUCTION VIDEO

Long Hau LEED Park is developed as a hybrid factory model, allowing businesses to flexibly arrange production areas, logistics, offices, testing centers, or R&D within the same space.

High-rise Factory

MULTI-FUNCTIONAL FACTORY
Flexible PRODUCTION Space Solutions

The Long Hau Multi-functional Factory is positioned with high standards for production space in Vietnam, integrating production, work, and accommodation in one area, with synchronized utilities both internally and externally.

PROJECT SPECIFICATIONS:

Total floor area: ~ 50,000m² | Area: 500 - 700 - 1,500 - ≥ 3,000m² | Clear height: 3.6 - 5.1m | Logistics corridor: 2.8m | Freight elevator: 2.5 - 3.5 tons

Status: Accepting Bookings for final units

Target Sectors: Testing, electronic assembly, medical supplies, packaging printing, garments... (clean and light industries, supporting industries, and high-tech supporting industries)

MASTER PLAN

TECHNICAL SPECIFICATIONS DESCRIPTION

Multi-purpose Specifications

PROJECT INTRODUCTION VIDEO

Moving beyond just providing production space, Long Hau Multi-purpose Factory is developed as a complete ecosystem, with synchronized facilities both inside and out.

EPE SPECIALIZED FACTORY

Designed for Export Processing Enterprises (EPE) with specific technical and legal standards. The project is optimized for specialized production and export processes.

PROJECT SPECIFICATIONS:

Total floor area: ~21,000 m² | Area: ~ 2,000 m² | Clear height: from 4,6 m to 4,73 m | Logistics corridor: 5 m - 8 m | Freight elevator: 4 tons | Total power capacity: 3,000 kVA 

Status: Construction expected in July 2026

 

LONG HAU IP LOCATION MAP



FACTORY LEASING PROCESS

2026 TAX REGULATION COMPARISON TABLE
CriteriaTax Policy Before Jan 1, 2026Tax Policy From Jan 1, 2026Reference Source
Incentive BasisBased on Industrial Park locationBased on Business Sector List-
CIT Incentive Rates10% for 15 years for Supporting Industries (SI) and High-Tech projects.10% for 15 years: High-tech, supporting industries, electronics, semiconductors... and medical, agriculture, environment applying high-tech.

Applied by revenue: 15% (≤ 3 billion VND), 17% (3–50 billion VND)
Articles 12 & 13, Law on CIT No. 67/2025/QH15
Exemption & Reduction Policy2-year exemption, 50% reduction for the next 4 years (20% tax rate)Exemption for up to 4 years and 50% reduction for up to the next 9 years.
Applied to income from projects in encouraged sectors (High-tech, SI, renewable energy, infrastructure...).
Clause 1, Article 14, Law No. 67/2025/QH15
Additional Advantages CIT Exemption for the first transfer of carbon credits, emission reduction certificates, and green bonds.

Emission reduction costs (Net Zero, carbon neutral) are considered deductible expenses when determining tax.
Article 4 & Clause b11, Article 9, Law No. 67/2025/QH15

* The above information is summarized from the Law on Corporate Income Tax No. 67/2025/QH15 for reference purposes only. The application of actual tax incentives depends on the specific conditions of each project and the guidance of competent authorities.

For information support and investment consultancy at Long Hau Industrial Park, please contact Long Hau IP Management Board - Hotline: 0906 938 599.

FACTORY SPECIFICATIONS COMPARISON
CriteriaLong Hau LEED ParkMulti-functional Factory
Total Gross Floor Area~56,000 m2~50,000 m2
Unit Area1,000 - 2,000 - 6,000 m2500 - 700 - 1,500 - ≥ 3,000 m2
Clear Height6m - 8.4m3.6m - 5.1m
Elevator Capacity4 tons2.5 – 3.5 tons
Loading Corridor5m2.8m
Power Capacity174 - 294 - 321 kVA/factory9-Storey Factory Building: 250–350 A/factory
6-Storey Factory Building: 100–250–350–400–500 A/factory
Handover StatusExpected Nov 2026Booking Open

View more

Industrial land
Ready Built Factory
Build to Suit Factory
High-Tech Factory
Long Hau Trading Center