Technical Infrastructure
- Home
- Technical Infrastructure
Technical Infrastructure
Wastewater treatment system
Wastewater treatment system
• Wastewater treatment system reaches the Standard Level A, capacity 2.000 cubic meters per day and can upgrade to 12.000 cubic meters per day.
• Concentrating wastewater treatment with 10,000 square meters of area is responsible for wastewater has been cleaned from primary production facility located in Long Hau IP.
Power Supply System
Power Supply System
Medium voltage system to border of land plot , meeting construction of factories and low-voltage supply for the project.
Long Hau IP is supplied by two sources:
• National Electricity Systems: Can Giuoc power station 110 KV/37MW- Long An Electric system.
• Power Station 110/22KV - 37 MWA (located in Long Hau IP)
Supply voltage: 22 KV - Frequency: 50 Hz.
Electricity price: based on price of the Electricity Vietnam (EVN)
Telecommunication system
Telecommunication system
• Telecommunications system is supplied by East Ho Chi Minh City Telephone Company, using Ho Chi Minh City telephone area code 08.
• With phone systems provided customers by East Ho Chi Minh City Telephone Company, investors will reduce inter-provincial cost calls to Ho Chi Minh City.
• Tenants will be supplied high speed optic cable networks with bandwidth up to 4 megabytes, which is available for ADSL, leased-line, and other services.
• By initial telephone numbers of Ho Chi Minh City, with two communication solutions transmitted for copper cable affixed and optical cable, ensuring contact information of customers transparently.