Factory leasing guide for food production & processing enterprises

Selecting an optimal production facility is decisive for obtaining Food Safety Certifications (HACCP, ISO 22000) and preventing cross-contamination. Food manufacturers expanding to Southern Vietnam should evaluate 4 core pillars:
1. Technical infrastructure & environmental licensing
- Discharge control & cross-contamination prevention: Prioritize industrial parks with fully segregated rainwater and wastewater drainage systems. Factories should feature individual wastewater sampling manholes before connecting to the central grid to ensure 100% compliance with national technical standards (QCVN) and mitigate shared liability risks during environmental audits.
- Turnkey legal & licensing support: Partner with developers offering comprehensive legal assistance (IRC, ERC, Environmental Registration/Permits, Fire Safety Approvals) to accelerate setup timelines and ensure on-schedule operations.
2. Flexible warehousing & storage capabilities
- In-House Storage Setup: Check engineering specs (floor load capacity, clear height, sandwich panel walls) to ensure the facility can easily accommodate cleanroom installations, anti-dust epoxy coatings, or internal cool/cold rooms.
- On-Site 3PL logistics integration: Prioritize locations with an integrated warehousing ecosystem (dry, cool, and cold storage) offering flexible short- or long-term leases within the park. This avoids heavy upfront capital expenditure (CapEx) and accommodates seasonal inventory spikes.
3. Prime location & supply chain optimization
- Lower Freight Costs & Sourcing Efficiency: Facilities should have direct access to key expressways and ring roads linking directly to the Mekong Delta agricultural belt, reducing transit times for fresh ingredients and minimizing product loss.
- Faster export deliveries & domestic retail reach: Proximity to deep-water seaports allows same-day container clearance, while short distances to Central Ho Chi Minh City ensure express distribution to modern retail channels (supermarkets, convenience store chains).
4. Co-located supporting ecosystem
- Supply chain synergy: Choose industrial zones with established clusters of packaging suppliers, freight forwarders, and specialized cold-chain logistics providers to eliminate intermediary transit costs and streamline lead times.
Q1: What is Long Hau LEED Park?
Answer: Long Hau LEED Park is a modern 4-story high-rise industrial facility consisting of 16 factory units with a total leasable floor area of approximately 56,000 m². It is situated in Long Hau Industrial Park, Can Giuoc, Long An Province—directly at the southern gateway to Ho Chi Minh City.
The project is developed under USGBC LEED Certified green building standards and is scheduled for Phase 1 completion by late December 2026.
Flexible Unit Sizes: 1,000 m² – 2,000 m² – 6,000 m².
Q2: Which food sub-sectors are suitable for Long Hau LEED Park?
Answer:
Suitable industries:
- Dry food processing
- Seasonings, food additives, and food flavorings
- Coffee, tea, and nuts
- Confectionery and snacks
- Functional foods and dietary supplements
- Packaging, bottling, and private label manufacturing (OEM/ODM)
- F&B distribution centers
Answer: Yes. The water infrastructure is designed to eliminate cross-contamination:
- Water supply: Two dedicated sources are available: standard industrial domestic water (metered separately per unit) and ready-to-drink RO water compliant with National Standard QCVN 6-1:2010/BYT, with connection stubs at each unit's entrance. Tenants save on independent water filtration CapEx.
- Wastewater drainage: Each unit features an independent wastewater drainage pipeline and an individual sampling manhole before discharging into the IP's central collection system. Tenants avoid initial manhole construction costs, maintain their own monitoring points, and eliminate shared liability during inspections.
- Operational cost savings: Centralized water supply and wastewater treatment plants directly operated by Long Hau Corporation (LHC) deliver competitive utility rates.
Answer: Businesses can choose between two operational models:
- Option 1 (In-house cold storage / cleanroom): Ideal for fully integrated production lines requiring continuous quality monitoring and zero transit between processing and storage.
- Option 2 (Outsourced on-site 3PL warehousing): Ideal for businesses seeking to reduce initial CapEx, manage high seasonal inventory swings, and optimize operating cash flow.
- On-Site ecosystem: Long Hau Industrial Park houses a major cold chain and logistics hub. Tenants can secure flexible leases directly on-site with reputable partners, including AJ Total Cold Storage, Nichirei TBA Logistics, Lotte Global Logistics, A Chau Cold Industry, SLP Long Hau, ESR Vietnam, and Anpha-AG.
Answer: Yes. Long Hau LEED Park offers high structural adaptability:
- Insulated sandwich panels: Dry construction allows swift reconfiguration, partitioning of raw/finished packaging zones, and future expansions.
- Structural flexibility: Heavy-duty reinforced concrete floors readily accept antibacterial/dust-proof epoxy coatings and thermal panel installations for cool/cold storage.
Answer: Yes. The 4-story facility is engineered for modern industrial machinery:
- Clear height: Architectural floor heights up to 8.4m accommodate overhead process piping, fresh air ducts, and complex HVAC systems.
- Floor load capacity: 4.0 tons/m² on the 1st floor and 1.0 ton/m² on Floors 2–4—suitable for automated packaging lines, bottling systems, industrial dryers, and heavy-duty racking.
- Internal logistics: Equipped with three 4-ton cargo lifts and four 1-ton passenger elevators. An 18m-wide internal concrete roadway and a 6m-wide fire-truck apron ensure seamless access and docking for 40ft container trucks.
Answer: The estimated timeline from contract signing to commercial operation is 3 to 4 months.
| Procedure | Timeline | Long Hau's Role |
|---|---|---|
| Investment Registration Certificate (IRC) | ≤ 47 working days | Co-drafting, representing at government agencies, online submission |
| Enterprise Registration Certificate (ERC) | 5 - 7 working days | Co-drafting, representation, and online submission |
| Environmental Registration (small-scale projects) | 30 working days | Representing explanation and handover of registration confirmation |
| Environmental Permit (large-scale projects) | 75 working days | Support in review, proposal report preparation, and result handover |
| Fire Safety Acceptance (PCCC) | ~15 days after construction | All-inclusive service package: consulting, supplementary design, construction, and acceptance coordination |
| Mandatory Insurance | Within 30 days from contract signing | Implementation guidance |
Answer: Located at HCMC's southern gateway, the park sits between the Mekong Delta raw material hub and Vietnam's largest consumer market.
- Raw material inflow: Direct access via the Ben Luc – Long Thanh and HCMC – Trung Luong expressways (1.5 hours to Vinh Long, 2.5 hours to Can Tho).
- Export logistics: 15 minutes to Hiep Phuoc & SPCT deep-water ports; 40 minutes to Cat Lai Port.
- Domestic distribution: ~12–19 km from central HCMC, enabling same-day express distribution to urban retail channels.
Answer: With over 300 operating enterprises, Long Hau IP offers a mature food-processing value chain:
- Food manufacturers: Nipponham Vietnam, Kitchen 4P's, Nitta Gelatin, R&B Food Supply, GN Food, Viet Huong Flavor, Cat Hai Food, Satori, Siba Food, Greenwitch Vina.
- Packaging suppliers: Bericap Vietnam, Hanh Minh Thi, Mason Plastic, Vinh Phat Plastic, Aplas, Minh Minh Nhut.
- 3PL logistics & cold storage: Lotte Global Logistics, Nichirei TBA Logistics, AJ Total, A Chau Cold Industry, ESR Vietnam, SLP Long Hau, Anpha-AG, Fujitrans.
- On-Site support services: Hourly forklift and cargo-handling services, worker/expert dormitories (40–50 m²), an on-site medical clinic, 2-hour maintenance response times, and 24/7 technical/security operations.
Answer:
- Indoor Air Quality (IAQ): Low-VOC construction materials and ASHRAE-compliant ventilation protect worker health.
- Energy cost reduction: High Solar Reflectance Index (SRI) roofing reduces thermal absorption, paired with smart sensor-activated lighting in common areas to cut electricity overhead.
- Audit readiness: Helps tenants easily pass ESG criteria, international buyer audits (FDI/export clients), and supermarket vendor qualifications.
The multi-story factory model at Long Hau (9-story project) has demonstrated proven success with a 98% occupancy rate within 8 months of launch. Long Hau LEED Park builds upon this track record with upgraded technical specifications built to LEED Certified green building benchmarks.
Food processing enterprises (dry foods, beverages, confectionery, additives, dietary supplements, F&B distribution) seeking cost-efficient, ready-built spaces are invited to schedule an inspection:
- Advisory hotline & site tour booking: (+84) 906 938 599
- Download technical specs & factory pricing: [Fill Out the Form to Receive Pricing Here]